Should-Cost Estimator
BetaA bottom-up price breakdown built section by section — purchased parts, material, processing, markups, packaging and logistics — the same structure as a sourcing price-breakdown sheet. Enter your part's details below; automatic estimates from drawings are coming soon. Currency:
Exchange rates applied: 1 USD = ₹94.51 · 1 EUR = ₹107.86 (indicative mid-market, as of 27 Jun 2026)
Part details
Region scales processing rates. India = baseline.
Purchased part cost
₹ 188.00| Bought-out component | Qty / assy | Unit cost | Line | |
|---|---|---|---|---|
| ₹ 84.00 | ||||
| ₹ 104.00 |
Finished parts bought from sub-suppliers (bearings, magnets, PCB, gears, seals…).
Material cost
₹ 182.75| Raw material | Weight (g) | Rate /kg | Line | |
|---|---|---|---|---|
| ₹ 182.75 |
In-house converted raw material. Cost = (weight ÷ 1000) × rate. Yield loss is handled under Markups (scrap).
Processing cost
₹ 40.16| Operation | Cycle (s) | Cav. | M/c /hr | Op. | Lab /hr | Amount | |
|---|---|---|---|---|---|---|---|
| ₹ 13.83 | |||||||
| ₹ 18.24 | |||||||
| ₹ 8.10 |
Material processing + assembly. Per piece = (cycle ÷ 3600 ÷ cavities) × (machine + operators × labour), × region. Use the calculator to derive a machine rate per hour from capex, power, maintenance and floor space.
Markups
₹ 105.37Packaging
₹ 15.49Returnable dunnage, trays, cartons.
Logistics cost
₹ 20.65Inbound + outbound freight, duties, handling.
Tooling
₹ 8.17 /pc| Tool type | Description | Cost / tool | Qty | Total | |
|---|---|---|---|---|---|
| ₹ 18,00,000.00 | |||||
| ₹ 5,00,000.00 | |||||
| ₹ 1,50,000.00 |
Spread over lifetime volume = annual volume × program life.
Indicative estimate. Default rates are mid-2026 India market references; tune them per supplier, region and volume.
Section structure mirrors a standard sourcing price-breakdown sheet: Purchased part · Material · Processing · Markups · Packaging · Logistics · Tooling.