Electric VehiclesManufacturingSuppliers

What European buyers check before they shortlist an Indian supplier

What procurement teams at European OEMs and Tier 1s look at in the first week of a sourcing project, and how Indian EV and auto component suppliers can be ready before the RFQ arrives.

EV Industry Team
Oct 7, 2026

02_Supplier_post_cover.png

Most Indian suppliers lose European business before they ever see a drawing.

Not because of price. Because the buyer had 20 names on a long list, needed 5 for the RFQ, and cut the rest in a few hours based on what they could find and how fast they got answers.

This is what happens on the buyer side of that table, and what you can do about each step.

Step 1: The desk check (before anyone contacts you)

A sourcing manager in Germany or Sweden starts with search, supplier databases and recommendations from colleagues. For each name they try to answer four questions in a few minutes:

  • What processes does this company actually run in house?
  • Which customers does it already supply, and at what tier?
  • Which certificates does it hold, for which plant?
  • Is there one person to contact who replies in English?

If your website shows product photos and a mission statement but none of the above, you are cut at this step. The buyer will not email you to ask.

What to do: * List your processes and the main machines with tonnage, bed size or envelope. “Machining” says nothing. “12 horizontal machining centres, pallet size up to 630 mm” says a lot * Name your customers if contracts allow it, or describe them: “two Indian two wheeler OEMs, one European Tier 1” * Put the certificate number and certified site next to each certificate * Give a named contact with a direct email, not only a contact form

Step 2: The certificate filter

For most automotive production parts, IATF 16949 is the entry ticket. Without it, many European buyers cannot onboard you as a direct supplier at all, whatever the price.

Buyers also check the certificate is valid today and covers the plant that will make the part. A certificate for your Pune plant does not help when the quote comes from your Hosur plant.

If you do not hold IATF 16949 yet, say so openly and say where you are in the process. “Stage 1 audit done in August, certification expected in Q1” is a far better answer than silence.

Step 3: The response test

The first email or RFQ is also a test. Buyers notice:

  • How fast you reply. Within one working day is normal in Europe. A week means you are behind on the comparison sheet before you start
  • Whether you answered every question. A partial quote with “details to follow” usually gets marked incomplete
  • Whether your quote can be compared. Price per piece, tooling as a separate line, Incoterm stated, packaging stated, validity period stated, payment terms stated

A competitor who is 4% more expensive and sends a complete, clear quote in two days often moves forward before you do.

Step 4: The process audit

Once you are on the short list, many German OEMs and Tier 1s audit the manufacturing process, often using VDA 6.3. This goes much deeper than the certificate. Auditors walk the line and check:

  • that the PFMEA and control plan match what actually happens on the shop floor
  • gauge studies and measurement systems for the critical features
  • how you control your own sub suppliers and job workers
  • how you handle parts that fail inspection

A common problem buyers run into: the critical process is subcontracted and nobody mentioned it. Be open about which steps go to job workers and how you control them. Hidden subcontracting found during an audit is usually the end of the project.

Step 5: The new paperwork from Brussels

European buyers now have legal duties that reach their suppliers. You will be asked for data you may never have collected.

CBAM (Carbon Border Adjustment Mechanism). The definitive phase started on 1 January 2026. Importers bringing in covered iron, steel and aluminium goods above a 50 tonne yearly threshold must be authorised declarants and report the embedded emissions. Many steel articles are already covered, including screws, bolts and nuts. Your EU customer needs emissions data from you to file. In December 2025 the European Commission also proposed extending CBAM from 1 January 2028 to around 180 downstream products, including vehicle parts such as gearboxes and wheels. That proposal still needs approval from the Parliament and the Council.

EU Battery Regulation. If you supply cells, packs or battery components, the due diligence obligations were postponed from August 2025 to August 2027. They have not gone away. Expect questions on the origin of raw materials and on carbon footprint.

What to do: get your energy and material input data per product in order now. A supplier who can answer the CBAM data request in the first week stands out, because most cannot.

A simple readiness checklist

Buyer checkReady if you can show
Desk checkProcesses, machines, customers, certificates and a named contact on one page
CertificatesValid IATF 16949 for the quoting plant, or a dated plan to get it
ResponseComplete quote within 1 to 2 working days, in a comparable format
Process auditPFMEA, control plan and MSA that match the shop floor, subcontracted steps declared
EU complianceEmissions data per product for CBAM, battery due diligence plan if relevant

Be found at the desk check stage

Voltbridge is where buyers from global OEMs and Tier 1s search for Indian EV component suppliers by capability, certification and location. A complete profile answers the four desk check questions before the buyer has to ask.

Listing is free.

Create your free supplier profile

Voltbridge Research

E

EV Industry Team

Our team of industry experts bringing you the latest insights.