Pricing your first export RFQ: Incoterms, packaging and payment terms

A low piece price loses when the rest of an export quote is unclear. How Indian component suppliers should state Incoterms, packaging, payment terms, tooling and validity in a first RFQ for a European buyer.

EV Industry Team
Nov 10, 2026

10_Supplier_post_cover.png

Your first export RFQ arrives. You work out the piece price carefully, send a one line quote, and hear nothing back.

Often the price was fine. The problem was everything around it. The buyer could not tell where the part would be handed over, how it would be packed, who pays for the tool or how long the price holds. So they priced in the risk themselves, and your number came out higher than a competitor's slightly more expensive but complete quote.

European buyers compare suppliers on total cost, not on piece price. Your job is to make that comparison easy. Here is how.

Why an unclear quote loses

When a buyer compares five quotes, they put every one into the same sheet: piece price, freight, duty, packaging, tooling, payment terms. Anything you leave blank, they fill in with an assumption. Their assumptions are cautious.

A complete quote also says something about how you run. A buyer reads a clear, structured quote as a sign that the PPAP, the shipping documents and the invoices will be clear too.

1. Choose the right Incoterm and name the place

The Incoterms 2020 rules from the International Chamber of Commerce (ICC) have 11 terms. Seven work for any mode of transport: EXW, FCA, CPT, CIP, DAP, DPU and DDP. Four are for sea and inland waterway only: FAS, FOB, CFR and CIF.

Three practical points for a first export quote:

  • Avoid EXW for export. It looks simple, but under EXW the buyer must handle loading and export clearance in India. The ICC strongly encourages traders to consider FCA instead of EXW when goods cross a border, and says EXW is most suitable for domestic trade.
  • Use FCA, not FOB, for containers. If you hand a container to the carrier at a terminal or ICD before it is loaded on the ship, the ICC says the seller is well advised to sell on FCA rather than FOB terms.
  • Always name the place. "FCA" alone is not a price. "FCA Nhava Sheva, Incoterms 2020" or "FCA our works, Chakan, Incoterms 2020" is. The place decides who pays for the truck and who carries the risk on the way.

If the buyer asks for a delivered price such as DAP, quote it. But show the freight part separately, and state how long that freight rate holds. Ocean rates move faster than your material costs.

2. Spell out the packaging

Packaging is the line most first quotes leave out, and it is where buyers expect surprises.

State, per part:

  • Parts per box and boxes per pallet
  • Box type, and whether it is one way or returnable
  • Corrosion protection for machined or steel parts on a long sea voyage
  • Pallet size and the weight per pallet

If you use wooden pallets or crates, they must meet ISPM 15. For the EU, wood packaging from outside the EU must be heat treated or fumigated, debarked, and carry the official ISPM 15 mark with the IPPC logo and codes for the country, the producer and the treatment. A shipment held at the port over a missing stamp is not a good first delivery.

If the buyer has its own packaging specification, ask for it before you quote. Packaging can move the landed cost more than a few rupees on the part.

3. Separate tooling from piece price

Quote tooling as its own line. Say:

  • The tooling cost and what it covers
  • Who owns the tool once it is paid for
  • How payment is split, for example on order and on PPAP approval
  • The expected tool life in parts

Buyers dislike tooling hidden inside the piece price. It makes the part look expensive and makes it hard to compare with a supplier who quoted tooling separately.

4. Payment terms you can actually carry

European buyers commonly ask for open account terms with payment some weeks after delivery. Decide what you can finance before you quote, because your working capital pays for the gap.

Know the rules on your side:

  • Realisation period. Under RBI rules, export proceeds for goods must be realised within nine months from the date of shipment, from 1 October 2026. The limit was 15 months between November 2025 and September 2026, so check advice you received last year. Your bank can extend it if you give reasons.
  • Letter of credit. For a new buyer you can ask for a letter of credit. Most are issued subject to the ICC's UCP 600 rules. It costs the buyer money and time, so many European buyers will refuse it for a regular supply contract.
  • Credit insurance. ECGC's policies cover buyer non payment and political risk. The specific buyer policy covers 90% of the loss. It is worth pricing in for a new buyer on open account.

5. Currency, validity and what is excluded

Close the quote with three short lines:

  • Currency. Quote in the buyer's currency, usually EUR, if you can. If you quote in INR, the buyer carries the exchange risk and will price it in. Say which exchange rate your price is based on.
  • Validity. 30 or 60 days is normal. Also say which raw material price the quote assumes, for example the steel price index or the aluminium price on a given date, and whether you want a material price adjustment clause.
  • Exclusions. Say what is not included: duty in the EU, testing beyond the drawing, special packaging. A buyer forgives an exclusion. They do not forgive a surprise on the first invoice.

Do not lean on export incentives to make the price work. RoDTEP is currently extended only up to 31 December 2026, and the EU India free trade agreement is concluded but not yet signed or in force. Price the part so it stands on its own.

A quote structure that works

LineWhat to write
Piece pricePer part, per annual volume band
IncotermRule, named place, "Incoterms 2020"
PackagingType, parts per box, pallet, one way or returnable
ToolingCost, ownership, payment split, tool life
Lead timeSamples, PPAP, serial supply
Payment termsDays, method, currency
ValidityDays, raw material basis
ExclusionsAnything the buyer may assume is included

Buyers increasingly check quotes against their own cost models. Our post on should costing shows how they build that estimate. A quote that is clear line by line is easier to defend against it.

This is a practical guide, not legal or tax advice. Check details with your bank, freight forwarder and customer.

Get the RFQs in the first place

Buyers on Voltbridge search Indian suppliers by process, location and certification before they send an RFQ. A complete profile gets you on the list.

Create your free supplier profile